Archive for June, 2005
Jun
24
corrosion protection / ribs
Posted by: | Commentscorrosion protection for the ribs. Riveted 1/2 of the ribs to the forward spar of the HS
Jun
18
stringer / inboard ribs
Posted by: | Commentsriveted stringers to inboard ribs
Jun
11
pre assembly of HS
Posted by: | Commentscleco’d together and final drilled skins to spars and ribs. Final drilled ribs to spars. dimpled ribs and countersunk stringers
Jun
10
stringers / began cleco of HS
Posted by: | Commentsfabricated stringers and began pre-assembly of horizontal stabilizers. cut holes in nose ribs for trim cables.
Jun
05
Completed HS front spar
Posted by: | CommentsFinish drilled, corrosion protected and riveted together the front spar for the horizontal stabilizer. attached spar caps, doubler, and bolt down brackets.