Current Build Stats:
My Hours Worked:     265.75
Hours by others:         38
Total Hours:                 303.75

Archive for March, 2009

Mar
27

Recessing the C-Frame

Posted by: jochs | Comments (0)

Finally built the cutout in the workbench to recess the skin dimpling frame. It worked out very well. the dimple die sticks up about 1/2″ from the surface of the table, so it is very easy to simply slide the skins across the table and it stays put without extra hands.

Categories : Workshop Setup
Comments (0)
Mar
27

right elevator de construction and prep

Posted by: jochs | Comments (0)

Disassembled the right elevator and reamed all of the drilled holes in all parts. Dimpled skins, ribs, and spars. Countersunk the holes in the rear spar and in the trailing edge piece. Also put an extra hole in the skin for the counterbalance !@#$%, I slipped with the squeezer when dimpling. I drilled out the hole and reamed it, so it should be ok…maybe I’ll squeeze an extra rivet in there or something to cover up the hole.

Categories : Right Elevator
Comments (0)